Bath Royal United Hospital

In May 2010 M J Patch completed the supply and installation of a ‘pioneering’ project involving the supply and installation of the new roof top plantroom at Bath RUH. The project consisted of initial design meetings and detailing which allowed us to off-site manufacture, erect and fully equip a platform with air handing units, compressors, and electrical circuits that could be commissioned prior to delivery to site. Following successful programming and route planning the Plantroom was then transported and craned up to the roof level and situated onto a steel platform that had been manufactured and pre-installed by M J Patch.

The complete steel solution

We're with you from beginning to end

Concept

 

Design

 

Fabrication

 

Z

Fit Out

 

The Complete Steel Solution