Dolphin Hall, Tetbury Steel Frame and Metsec

MJ Patch had the pleasure of working directly for the Dolphin Hall in Tetbury on their project to replace their tired cricket pavilion with a fresh new building. MJ Patch Engineering were appointed to design, supply and install the steel frame, Metsec cladding rail and roof purlins, the building design has an integrated canopy that was thermally broken and galvanised to prevent corrosion. Our in house AP Conor came up with the great idea of utilising a crawler crane for the installation to make tracking up and down and moving the pieces around the site a piece of cake without having to rig and de-rig a crane every time we needed to move position.