Chepstow Castle

Working for Ellis Restoration in Spring 2008, M J Patch successfully completed the supply and installation of the steel frame and stainless steel mesh perimeter panels that formed the new roof structure on St Martin’s tower. The project faced challenging elements such as surveying the existing stone structure, production of workshop drawings, access for installation and craning the steelwork to the working area.

The complete steel solution

We're with you from beginning to end

Concept

 

Design

 

Fabrication

 

Z

Fit Out

 

The Complete Steel Solution