Interserve: Brize Norton 47AD

July 2012 saw the successful completion of the installation of internal AHU platforms, cantilevered service walkways and access staircase’s within the new air dispatch facility at Brize Norton.  M J Patch’s involvement in the project began back in 2010 at the early stages of design with the projects M&E consultants, Architects and Structural Engineers.  This development allowed for the off-site manufacture, assembly and pre-commissioning of 24no CIAT Ozonair units within our warehouse, before being transported and craned into position on site.  The concept allowed for the majority of assembly of all major platforms, walkway sections and staircases at a ground level and away from site, with installation completed within an impressive 16 weeks.