MJPatch have Supplied and Installed Road Side Barriers and Balustrades at Cheddar Gorge and Caves

M J Patch initially carried out the design, manufacture and installation of a steel powder coated two storey internal feature staircase and balustrade to tie into the existing building and match the architects industrial design intent of the building. The staircase comprised of structural steel supporting members, galvanised folded durbar treads and landings (with painted … Read more

We have a courtyard walkway canopy recently completed for a Boutique Hotel in Bath city centre

Fabrication & Supply of 2 Aluminium 132kV Disconnector Support Structures

MJ Patch were appointed to develop the Design and Installation of a Architectural Woven Mesh Balustrade for a new office staircase. The design consisted of hollo section columns and bracings in a powder coated finish, stainless steel handrails with Woven Stainless Steel Mesh. MJ Patch worked closely with Mendip Manufacturing Agency on the design and … Read more

Design, supply and installation of structural steelwork to support the underside of the external patio area and create function rooms below.

Bronze Anodised Cladding panels to the existing staircase as part of the refurbishment project for County Contractors

MJ Patch were appointed to complete the installation of a large staircase and support tower frame on top of a new hospital roof building. The installation consisted of a large self-erecting tower crane over the existing building to lift materials into place.

Supply & Install of a New Steel Frame Extension for the A&E Unit at a Local Hospital including installation of concrete roof planks.

Working for the UK’s largest multimodal logistics company Eddie Stobart, MJ Patch & Co, along with local structural engineers JDL were tasked with supplying Mercedes-Benz Formula One team with a new light weight easy to assemble sub-frame for their new Motorhome. Working to a short contract we designed and manufactured the new aluminium sub-frame that … Read more

With planning permission granted, the construction of the New MJ Patch HQ is well underway! Thanks to Ray and Chris  @ Inspire Architects, Jeremy and Rob @ Craddys & Nick and Paul @ Box Twenty for their hard work, creativity and design input. July see’s the completion of the substructures and galvanised steel frame, with … Read more

Supply & Installation of Secondary Support Steelwork for the New Entrance at a Local Hospital including different types of powder coated cladding items.